Pre-Delivery Inspections

Inspection will be carried out at the manufacturer’s works as per governing specifications.

By conducting the tests with the testing facility available with the manufacturer to confirm whether the quality & quantity of the product specification mentioned in the work order/clients requirements.

The products inspected are marked /stamped as a identification of inspection process

Post-Delivery Inspections

The inspection will be conducted on the products before put in to use at the stock yard/site as per the SULEK standard practice/methodology.

 

Site Inspections

Inspection will be carried out as per the SULEK standard practice/ approved methodology.

 

Products Covered

  • UPvc Pipes
  • Column Pipes
  • MS/CI Pipes
  • FRP Products
  • Verticle Turbine Pumps
  • SWR Pipes
  • GRP Pipes
  • Spun Pipes
  • HDPE Pipes
  • Casing Pipes
  • DI Pipes
  • Valves and Fittings
  • Submersible Pump Sets
  • PVC Cables and Accessories
  • Centrifugal Motors

Home About Us Policy Contact Us